May 2013-December 2013 - EGEC

Submitted by engmdik on Mon, 05/11/2020 - 18:37
Civil Engineer
  • Lead engineer on $750 million water transmission lines serving three provinces in Saudi Arabia.
  • Planned and designed water distribution and wastewater collection systems.
  • Prepared detailed design for main water transmission pipelines including alignment sheets, air and wash valves, and crossings details.